Search
Close this search box.

Heavy-Timber Log Cabin Material Preparation Report

This report confirms the completion of material preparation for the heavy-timber log cabin project in a mountain resort. The project requires materials that meet structural load-bearing standards, so the main materials prepared include 180 pieces of Douglas fir heavy timbers (specifications: 150mm×250mm, 200mm×300mm) for the frame, 320 square meters of spruce structural plywood for wall and floor sheathing, and 50 liters of water-based anti-corrosion paint (complying with GB/T 27717-2011). All materials are sourced from qualified suppliers with official quality certificates, and the heavy timbers have undergone pre-cutting and polishing to match the project’s design dimensions.
​
Material quantity and quality checks were conducted before storage. The heavy timbers were verified to have no cracks, decay, or insect damage, with a moisture content of 12%-14% that meets heavy-timber cabin requirements. The structural plywood was inspected for uniform thickness and firm bonding, with no delamination. All materials are now stored in a well-ventilated, moisture-proof warehouse, with heavy timbers placed on 30cm-high brackets to avoid ground contact and moisture absorption.
​
This material preparation ensures that subsequent construction can proceed without delays. The prepared materials fully align with the project’s design and quality standards, providing a solid foundation for the heavy-timber log cabin’s structural safety and durability.
Email
Email: admin@cabincn.com
WhatsApp
WhatsApp: +86 15803091619
WhatsApp
WhatsApp QR Code
(0/8)