We hereby confirm that the log cabin construction project commissioned by Ms. Jennifer has been successfully completed. The project, located in Italy, began construction on 2024.1.2 and achieved completion on 2024.1.28, with the entire process supervised by Ms. Elsie to ensure compliance with design requirements. Key parts like log waterproofing treatment and roof insulation layers have been constructed as required, and all functional areas are in normal use condition.
A final quality inspection was conducted on 2024.2.10 , covering aspects such as log material durability, structural load-bearing capacity, and facility operation. The inspection results show that all indicators meet national and industry-related standards, and no quality defects or safety risks were found. The construction team has also cleaned up the construction site and removed all construction waste.
This report is issued to confirm the completion status of the project. The Ms. Elsie can arrange for formal handover and use of the log cabin after reviewing and confirming the content of this report.