Search
Close this search box.

Home Tea Room Construction Report

The log cabin project constructed for Mr. Shen was completed on 2023.6.14. The project covers a construction area of 25㎡ and includes functional areas such as bedrooms, living rooms, and kitchens. All construction materials used meet the
national environmental protection and quality standards.
After a comprehensive inspection, the log cabin’s load-bearing structure meets the safety standards, the installation of doors and windows is accurate (no air leakage or water seepage), and the interior decoration meets the aesthetic and practical requirements agreed with the owner.
At present, all aspects of the project meet the completion conditions. We will provide Mr. Shen with a one-year after-sales maintenance service, and hand over all project documents to the owner for storage.
Email
Email: admin@cabincn.com
WhatsApp
WhatsApp: +86 15803091619
WhatsApp
WhatsApp QR Code
(0/8)