Construction Completion Report of Guizhi Wooden Houses in Hangzhou

This log cabin construction project located at HangZhou was officially completed on 2022.10.21. The project mainly included the construction of the main log structure, roof installation, interior and exterior decoration, and supporting facility configuration. All construction processes strictly followed the design drawings and relevant construction standards.
 
 
After on-site inspection by the project team, the log cabin’s structure is stable, the decoration quality meets the requirements, and all supporting facilities (such as water supply, electricity, and heating systems) operate normally. There are no quality problems or safety hazards found.
 
 
The project is now qualified for handover. The relevant construction materials, design documents, and inspection records will be sorted and handed over to GuanZhi together with the log cabin.