Search
Close this search box.

Construction Report of the Commercial Cabin

The log cabin construction project commissioned by Wanda Plaza has been fully completed as of 2023.4.5 . During the construction period, the construction team strictly implemented the construction plan, and completed the log processing, wall assembly, floor laying, and other key links with high quality.
The completion acceptance work was carried out jointly by the construction party, supervision party, and Longbang Wood Products. The inspection results show that the log cabin’s appearance is neat, the internal space layout meets the design requirements, and the performance of thermal insulation and moisture-proof meets the specified indicators.
This project has successfully achieved the expected construction goals. We hereby confirm the completion of the project and wait for the follow-up handover procedures with Wanda Plaza.
Email
Email: admin@cabincn.com
WhatsApp
WhatsApp: +86 15803091619
WhatsApp
WhatsApp QR Code
(0/8)